Pari Veado Hydroelectric plant


Nominal capacity
1.34 MW
Equipment hype
1 Francis type vertical turbine
Head 17.5 m
Generating flow 10,6 m³/s
River basin
Parapanema River (sub-basin of the Plata River)
Location São Paulo, Brazil

Pari Veado is located 160 kilometers from Presidente Prudente, in the suburbs of Candido Mota.
The plant is connected to an earth dam reservoir with a built-in forebay. A short concrete penstock feeds the powerhouse with a 1.34 MW generating set.
The power plant was built and initiated operations in 1937.