Pullinque hydroelectric plant is located 818 kilometers from Santiago, near Panguipulli city which sells energy and capacity to Endesa and Codelco. The plant is connected to the “Sistema Interconectado Central (SIC)”, the main transmission system that covers most of the largest cities, including Santiago.
- Municipality: Valdivia
- Province: Valdivia
- Year of construction: 1958-1962
- Type: Hydro
- Capacity: 51.4 MW
- Unities: 3
- Fuel: Water
- Size: 130 m³/s
- Production: 225.000 GWh/Year
- Equipment used: Vertical Francis Turbines