Municipality Argitheas
Prefecture Thessaly
Year of Construction 2009
Year of Operation 2011
Technology Hydroelectric
Type Run-of-the-river
Fuel Water
Height 310m
Number of Units 1
Installed Generating Capacity 6,35 MW
Water Flow (m3/h) 8,640
Energy Production 12,00 GWh
Equipment Used Turgo