WEBVTT
kind: captions
lang: en

STYLE

1
00:00:38.600 --> 00:00:40.200 position:25% size:50%
A huge satisfaction.

2
00:00:40.240 --> 00:00:43.520 position:25% size:50%
Because managing to complete
the wind farm on time,

3
00:00:43.560 --> 00:00:46.280 position:25% size:50%
during the year of the pandemic,

4
00:00:46.320 --> 00:00:48.080 position:25% size:50%
was by no means a given.

5
00:00:48.360 --> 00:00:50.640 position:25% size:50%
We succeeded thanks to the combined effort

6
00:00:50.640 --> 00:00:52.160 position:25% size:50%
of the whole Enel team

7
00:00:52.160 --> 00:00:55.960 position:25% size:50%
and our close collaboration
with suppliers and contractors.

8
00:00:56.600 --> 00:00:58.560 position:25% size:50%
There were a number of challenges,

9
00:00:58.560 --> 00:01:00.640 position:25% size:50%
but undoubtedly the main one

10
00:01:00.680 --> 00:01:03.400 position:25% size:50%
was managing work on more than
one front over such an extended area,

11
00:01:03.400 --> 00:01:05.320 position:25% size:50%
even outside of the plant site.

12
00:01:05.680 --> 00:01:09.400 position:25% size:50%
It was a bit like managing lots
of small construction sites at the same time.

13
00:01:17.200 --> 00:01:20.400 position:25% size:50%
Digitalization was an essential aspect.

14
00:01:20.400 --> 00:01:25.840 position:25% size:50%
Thanks to the Wi-Fi coverage provided
by our smart connectivity box,

15
00:01:26.320 --> 00:01:30.800 position:25% size:50%
we were able to perform continuous security checks

16
00:01:30.800 --> 00:01:36.000 position:25% size:50%
and quality control assessments
on the work and site visits, all carried out remotely.

17
00:01:38.520 --> 00:01:40.640 position:25% size:50%
To ensure the utmost safety –

18
00:01:40.640 --> 00:01:44.280 position:25% size:50%
in addition to respecting the health measures

19
00:01:44.280 --> 00:01:47.000 position:25% size:50%
specified by the local and national authorities –

20
00:01:47.080 --> 00:01:49.640 position:25% size:50%
we drew up behavior protocols
to be followed

21
00:01:49.640 --> 00:01:52.200 position:25% size:50%
during all construction activities.

22
00:02:04.560 --> 00:02:09.200 position:25% size:50%
Enel Green Power’s prerogative
is the sustainable construction site model.

23
00:02:09.200 --> 00:02:11.960 position:25% size:50%
Our goal is to protect the environment,

24
00:02:11.960 --> 00:02:15.640 position:25% size:50%
to work in close collaboration
with local communities,

25
00:02:15.760 --> 00:02:19.080 position:25% size:50%
and to promote circular economy practices
as much as possible.

26
00:02:19.080 --> 00:02:26.360 position:25% size:50%
Partanna is a new starting point
for both Enel and Italy,

27
00:02:26.400 --> 00:02:29.720 position:25% size:50%
for the development of
an increasingly sustainable economy.

28
00:02:29.720 --> 00:02:32.200 position:25% size:50%
It is no coincidence that we began in Sicily,

29
00:02:32.200 --> 00:02:34.840 position:25% size:50%
one of the first regions to be involved

30
00:02:34.840 --> 00:02:39.040 position:25% size:50%
in this process of the energy transition
for the protection of the environment.

31
00:02:39.120 --> 00:02:43.440 position:25% size:50%
I feel that we’ve accomplished an incredible feat,

32
00:02:43.440 --> 00:02:47.720 position:25% size:50%
one that is even more special
because we never lost sight

33
00:02:47.720 --> 00:02:49.920 position:25% size:50%
of the needs of the local community.

34
00:02:50.080 --> 00:02:52.560 position:25% size:50%
We did everything possible to minimize

35
00:02:52.640 --> 00:02:55.320 position:25% size:50%
any disruption our activities might have caused.

36
00:02:57.720 --> 00:03:00.240 position:25% size:50%
Partanna is a 15MW plant

37
00:03:00.280 --> 00:03:05.400 position:25% size:50%
that at full power will help meet
the energy needs of 10,000 households,

38
00:03:05.480 --> 00:03:11.640 position:25% size:50%
preventing the emission of around 33,000 metric tons
of CO2 into the atmosphere each year.

39
00:03:12.480 --> 00:03:15.000 position:25% size:50%
It’s also an important contribution

40
00:03:15.000 --> 00:03:19.000 position:25% size:50%
towards the achievement of
the UN’s Sustainable Development Goals.

41
00:03:20.720 --> 00:03:24.360 position:25% size:50%
I’m very proud to have contributed

42
00:03:24.400 --> 00:03:28.920 position:25% size:50%
in a tangible way to the process
of the energy transition

43
00:03:28.920 --> 00:03:32.080 position:25% size:50%
and to the protection of the environment
and the territory of our country.

NOTE
end of file