The Esparragal I Solar Park
The Esparragal I Solar Farm is located in the municipality of Guillena, in the province of Seville, Andalusia. Endesa invested 42.6 million euros in its construction. With an annual output of 108.5 GWh, the plant is capable of meeting the energy needs of 27,510 households, a figure comparable to the combined energy consumption of Guillena, Corredor de la Plata, Santiponce, and Camas. The plant’s renewable energy production also prevents the release of 44,436 metric tons of CO₂ into the atmosphere each year, equivalent to the annual emissions of approximately 30,000 cars.
With the completion of construction, the plant has become the fifth solar farm built by Endesa in this province. Guillena, one of the stops along the famous Camino de Santiago, is surrounded by parks and waterways.
Technology
Solar
Status
In operation
Capacity
47.5 MW
Energy output
108.5 GWh
CO₂ emissions avoided
44,436 tons per year
Power supplied
27,510 families per year
Milestones
Impact on the local communities
The construction of the park followed our “Sustainable Construction Site” model, which involves the installation of photovoltaic solar panels to cover part of the construction site’s energy needs, the adoption of water-saving measures, such as the installation of cisterns and rainwater harvesting systems, the provision of charging stations for electric vehicles, and the use of energy-efficient lighting. Once construction was completed, all of this equipment was donated to local municipalities, which are now using it for the benefit of all residents.
The project was also developed from the very beginning according to principles of circularity, with the goal of promoting the plant’s increasing integration into the local area and leveraging potential synergies with local activities. In fact, a total of 640 people worked on the plant’s construction. To maximize the project’s socioeconomic impact on local communities, the use of local labor and local services, such as catering and lodging for workers, was also encouraged. In this regard, training courses were held for approximately 40 people on the installation of photovoltaic panels and the operation and maintenance of solar systems, with the goal of training and developing a skilled local workforce.
Contacts
Spain
Ribera del Loira, 60, 3D
28042 - Madrid